 NEW NETS UNDER CONSTRUCTION
Tuesday 13 May 2008 More practice facilities in the pipeline
What was a one evening project began on the top ground last night with a handful of the faithful assisting groundstaff with the erection of new net facilities and the overhaul of the old.

All the old netting was removed from the frames and when that was completed the new framwork for the portable net was unpacked and arranged for build


It was quickly established that no one had a degree in engineering and indeed had little in the way of lego experience.

Synchronised bolting from Secretary and Captain

As the swallows protested, the Nissan hut was the scene of action, as grips spanners, bolts and 'footprints' were used as the light faded. With some direction from Nigel Moreland and utilisation of various climbling apparatus, the second attempt proved more successful and the job was left for completion on Thursday evening

Big Raymond stood like this for 5 minutes, without profanity, as the other end of the frame was connected.
|